Back

Phyzbatch 9000 Final Function Testing

This procedure lists the steps to final function testing for fully assembled new and refurbished machines. This is important to ensure all units are working properly prior to shipping.
TCG Machines
04/18/2024

Phyzbatch 9000 Final Function Testing

This procedure lists the steps to final function testing for fully assembled new and refurbished machines. This is important to ensure all units are working properly prior to shipping.

    Employee Name Performing Final Test

    Pokemon Sort Results

    Magic Sort Results

    FOIL SORT TEST - MTG %

    FOIL SORT TEST - POKEMON %

    Sequence 1 Dielectric Voltage Test - 1500V / 124uA): Result - mA

    Sequence 2: Earth Continuity Test: Passed ??

    • Yes
    • No
    • N / A

    FINAL PRE SHIP CHECKLIST

    SWAP OR FULL MACHINE BUILD

    Conveyor Serial # For Full Machine only

    Chassis Serial# For Full Machine Only

    FINAL PHYZBATCH SERIAL#

Source: TCG Machines (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.