OVERHEAD CRANE PRE-OPERATIONAL CHECKLIST
This pre-use checklist intends to identify defects and safety hazards before operation. The main aim of a pre-start checklist inspection is to ensure that your equipment is safe to use.
OVERHEAD CRANE PRE-OPERATIONAL CHECKLIST
This pre-use checklist intends to identify defects and safety hazards before operation. The main aim of a pre-start checklist inspection is to ensure that your equipment is safe to use.
CRANE NO.
CAPACITY
TYPE
LOCATION
OPERATORS NAME:
INSTRUCTIONS: Check all items. Inspect and indicate as:
YES, NO and NA (Not Applicable)
WALK AROUND INSPECTION
Foundations
Access
Secured Items
Walkways/Handrails
Bridge Brake
Hydraulics
Couplers/Connection Rods
End Trucks
Rail Sweeps
Windlocks/Chock/Stops
Housekeeping
MACHINERY INSPECTION
Holding Brake
Load Control Brake
Covers Secured
Upper Sheaves
Wire Rope
Hooks: Cracks, Wear, Deformation, * Throat Opening, Latch Operation
Fluid Leaks
Batteries
Electric Motors
Electric Panels
Runway/Bridge Conductors
Runway/Bridge Collectors
Electrical Guards
Festoon System
Warning Tags/Signs
Exposed Electrical Hazards
Trolley Stops
INSTRUCTIONS: Inspect all applicable items each shift of operation. Suspend all operations immediately when observing an unsatisfactory condition for asterisked (*) items. In addition, suspend operation when any unsafe condition is observed and immediately notify supervisor. Other conditions not affecting safety shall be noted under "Remarks" and reported to supervisor.
REMARKS:
Source: MaintainX (Community Member)