Back

AquaEdge® Water-Cooled Centrifugal Chiller Unit 19DV | Scheduled Maintenance

This annual procedure focuses on different kinds of your equipment's filters and in-track baffles. This will help ensure that your unit performs at it's peak for a long period of time.
MaintainX
10/24/2021

AquaEdge® Water-Cooled Centrifugal Chiller Unit 19DV | Scheduled Maintenance

This annual procedure focuses on different kinds of your equipment's filters and in-track baffles. This will help ensure that your unit performs at it's peak for a long period of time.

    Establish a regular maintenance schedule based on your actual chiller requirements such as chiller load, run hours, and water quality. The time intervals listed in this section are offered as guides to service only.

    Service Ontime

    Inspect the Control Panel

    WARNING: Ensure power to the starter is isolated when cleaning and tightening connections inside the starter enclosure. Failure to disconnect power could result in electrocution.

    Inspect the Purge

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.