AquaEdge® Water-Cooled Centrifugal Chiller Unit 19DV | Scheduled Maintenance
This annual procedure focuses on different kinds of your equipment's filters and in-track baffles. This will help ensure that your unit performs at it's peak for a long period of time.
AquaEdge® Water-Cooled Centrifugal Chiller Unit 19DV | Scheduled Maintenance
This annual procedure focuses on different kinds of your equipment's filters and in-track baffles. This will help ensure that your unit performs at it's peak for a long period of time.
Establish a regular maintenance schedule based on your actual chiller requirements such as chiller load, run hours, and water quality. The time intervals listed in this section are offered as guides to service only.
Service Ontime
Inspect the Control Panel
WARNING: Ensure power to the starter is isolated when cleaning and tightening connections inside the starter enclosure. Failure to disconnect power could result in electrocution.
Inspect the Purge
Source: Carrier (www.shareddocs.com)