Series R® Helical Rotary Chiller: Weekly Maintenance
This procedure is the recommended weekly maintenance procedure for your equipment. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Series R® Helical Rotary Chiller: Weekly Maintenance
This procedure is the recommended weekly maintenance procedure for your equipment. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Maintenance
Perform all maintenance procedures and inspections at the recommended intervals. This will prolong the life of the chiller and minimize the possibility of costly failures.
Use the “Operator’s Log”, such as that show in chapter “Log and Check Sheet,” p. 124 to record an operating history for unit. The log serves as a valuable diagnostic tool for service personnel. By observing trends in operating conditions, an operator can anticipate and prevent problem situations before they occur. If unit does not operate properly during maintenance inspections, see “Diagnostics,” p. 103.
After unit has been operating for approximately 30 minutes and system has stabilized, check the operating conditions and complete procedures below:
Weekly
While unit is running in stable conditions.
Source: Trane (www.trane.com)