Gemini® Two-Stage Commercial Split System Unit 38AUD - Routine System Maintenance
This procedure is for the routine maintenance of your Two-Stage Commercial Split System Unit. It also includes a list for the needed quarterly inspection and seasonal maintenance.
Gemini® Two-Stage Commercial Split System Unit 38AUD - Routine System Maintenance
This procedure is for the routine maintenance of your Two-Stage Commercial Split System Unit. It also includes a list for the needed quarterly inspection and seasonal maintenance.
These items should be part of a routine maintenance program, to be checked every month or two, until a specific schedule for each can be identified for this installation:
Quarterly Inspection (and 30 days after initial start) —
Indoor section
Seasonal Maintenance —
These items should be checked at the beginning of each season (or more often if local conditions and usage patterns dictate)
Air Conditioning
Heating
Economizer or Outside Air Damper
Source: Carrier (www.shareddocs.com)