Weekly Ventilation and Visible Emissions Inspection Log
SOP 14 - Baghouse and dust collection systems inspection
Weekly Ventilation and Visible Emissions Inspection Log
SOP 14 - Baghouse and dust collection systems inspection
Date (Fecha):
Discharge Systems
Check all moving parts on discharge systems and screw conveyor bearings (Revisar todas las partes con moviemiento en el sistema de descarga y los baleros del tornillo que mueve el material)
Damper Operations
Check damper operations, bypass, isolation, etc. (Revisar el reductor de vibracion, bypass, aislamiento)
Bag Tensioning
Spot check bag tensioning on reverse air and shaker bags. (Revisar la tension de las bolsas con aire al contrario y el vibrador de bolsas)
Compressed Airline
Check compressed airline including line oilers and filters. (Revisar la linea de aire comprimido incluyendo las aiceiteras y filtros)
Temperature Gauges
Check accuracy of temperature gauges. Blow out gauge lines. (Revisar la funcion de los medidores de temperaturea. Sopletear las lineas de aire de los medidores)
Cleaning Sequence
Check cleaning sequence to ensure valves seating properly. (Revisar la sequencia de limpieza para asegurarse que las valvulas esten puestas correctamente)
Drive Components
Revisar drive components on baghouse fan. (Revisar los componentes de accionamiento del baghouse)
Notes/Comments
Inspector:
Click here to sign