Complete so generator is ready for operation in the event of a power failure.
Farmdale Creamery Inc
03/07/2023

Generator Test and Inspection

Complete so generator is ready for operation in the event of a power failure.
    • 1.jpg

    Operation Switch has 4 positions, and only rotates clockwise.

    • 3.jpg

    Check for Leaks and Abnormal Vibrations.

    Enter Voltage while Running.

    • 2.jpg

    Operation Switch has 4 positions, and only rotates clockwise.

    • 3.jpg
    • 1.jpg

    Log Hours of Generator

    • 4.jpg
Source: Farmdale Creamery Inc (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.