Generator Test and Inspection
Complete so generator is ready for operation in the event of a power failure.
Generator Test and Inspection
Complete so generator is ready for operation in the event of a power failure.
Operation Switch has 4 positions, and only rotates clockwise.
Check for Leaks and Abnormal Vibrations.
Enter Voltage while Running.
Operation Switch has 4 positions, and only rotates clockwise.
Log Hours of Generator
Source: Farmdale Creamery Inc (Community Member)