Cold Generator™ Scroll Chillers CGWR Series - Weekly Maintenance
This procedure is the recommended weekly maintenance procedure for your equipment. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Cold Generator™ Scroll Chillers CGWR Series - Weekly Maintenance
This procedure is the recommended weekly maintenance procedure for your equipment. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Once the unit has been operating for about 10 minutes and the system has stabilized, check operating conditions and complete the checkout procedures that follow.
Inspect the entire system for unusual conditions. Use an operating log to record a weekly operating conditions history for the unit. A complete operating log is a valuable diagnostic tool for service personnel.
Source: Trane (www.trane.com)