Passenger Ropeway Operational Checklist
Use this template for the basic guidelines during operation inspection.
Passenger Ropeway Operational Checklist
Use this template for the basic guidelines during operation inspection.
BASIC GUIDELINES FOR INSPECTION DURING OPERATION INSPECTION
MAINTENANCE DOCUMENTATION
Pre-season Inspection documentation
Mechanic or mechanic in training certificates are up to date
Periodic Engineers Assessment (see also DSO 224/07 Schedule for Compliance Dates)
Maintenance Safety Procedures (Procedures, Lockout Tagout)
Maintenance Log on site and up to date
Five year load test
NDT Report for haul, counterweight and/or track rope (see DSO 184/03 & 185/03 (BM Lifts)
Wire Rope Log on site and up to date
Splice Certificate
NDT Report for chair/gondola,/tram cabin hangers and grips
OPERATION DOCUMENTATION
TSSA Incident Reporting Training & Documents
Personnel Training (operators, attendants, and emergency evacuation staff)
Operations Manual up to date and available (Operation, Evacuation, & Hazardous Objects or Material)
Evacuation Plan (see also 11.16 for requirements)
Recording of Abnormalities
Termination of Daily Operation Procedures
Daily Inspection Checklist in Place and Up to Date (see also 11.12 for content)
First Aid
TERMINALS
Communication (must be dedicated and functioning)
Evacuation Drive (see also 11.15.2)
Grounding of the Haul Rope
Fire Protection
Signs (see Table 3 as a reference)
LOADING & UNLOADING AREA
Minimum Number and Location of Operating Personnel
Ramps, Instructions & Procedures
Control of Passengers (corral, barrier, or markers)
Signs (see Table 3 as a reference)
LIFT LINE
Unload Sign Placement and Clearance Under Lift
Tow Path (see also 6.2 Surface Lifts, 7.2 Rope Tow, 8.2 Secondary Carriers, and 9.2 Conveyors)
Clearance Under the Lift Line (see also 5.3)
Signs (see Table 3 as a reference)