Back

JLG Telehandlers 3706PS: Pre-Opertation Check and Inspection

Use this checklist and inspection form at the beginning of each workshift or at each change of operator.
MaintainX
10/11/2022

JLG Telehandlers 3706PS: Pre-Opertation Check and Inspection

Use this checklist and inspection form at the beginning of each workshift or at each change of operator.

    The pre-operation check and inspection, performed at beginning of each work shift or at each change of operator, should include the following:

    Cleanliness

    Structure

    Safety Decals

    Operation and Safety Manuals

    Fluid Levels

    Attachments/Accessories

    8. Operational Check

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.