    Maintenance Intervals

    If installed in an appropriate environment, the drive requires very little maintenance. This table lists the routine maintenance intervals recommended by Daikin.

    • Screenshot2021-02-26at7.00.59AM.png

    Maintenance:

    Application:

    Interval:

    Instruction:

    Frame Sizes R7 and R8

    Refer to the installation instructions supplied with the fan kit. Enclosure fan replacement – UL Type 12 enclosures UL type 12 enclosures include an additional fan (or fans) to move air through the enclosure.

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.