Back

Gemini® Packaged Air-Handling Unit 40RUQ - Maintenance

This procedure is for the inspection and maintenance of your Packaged Air-Handling Unit. It includes a list for the recommended cleaning procedures and inspection of panels and sealing of unit.
MaintainX
10/24/2021

Gemini® Packaged Air-Handling Unit 40RUQ - Maintenance

This procedure is for the inspection and maintenance of your Packaged Air-Handling Unit. It includes a list for the recommended cleaning procedures and inspection of panels and sealing of unit.

    Inspection and maintenance should be performed at regular intervals and should include the following:

    Inspection of panels and sealing of unit against air leakage

    • Pass
    • Flag
    • Fail

    Testing for cooling/heating system leaks.

    • Pass
    • Flag
    • Fail

    Checking of all electrical connections.

    • Pass
    • Flag
    • Fail

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.