CenTraVac Water-Cooled Chiller CVHE - Semi-Annual Maintenance
This semi-annual procedure is for lubricating the vane control linkage bearings, ball joints, and pivot points. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
CenTraVac Water-Cooled Chiller CVHE - Semi-Annual Maintenance
This semi-annual procedure is for lubricating the vane control linkage bearings, ball joints, and pivot points. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Source: Trane (www.trane.com)