Back

Omnizone™ Constant Volume Water-Cooled Cooling Unit 50BVZ: Monthly Maintenance

This monthly maintenance procedure focuses on air filters. It gives you instructions on how to inspect the air filters and how to replace them.
MaintainX
10/24/2021

Omnizone™ Constant Volume Water-Cooled Cooling Unit 50BVZ: Monthly Maintenance

This monthly maintenance procedure focuses on air filters. It gives you instructions on how to inspect the air filters and how to replace them.

    Air Filters

    The 50BV single-piece units come with 1-in. filters. The standard 1-in. filters provide lower pressure drop and longer filter service intervals. The 50BV modular units come with 4-in. filters.

    Inspect air filters every 30 days and replace filters as necessary.

    Replacement filters should have a minimum efficiency rating of MERV 6 per ASHRAE rating procedures and be rated for up to 625 fpm velocity. Job requirements or local codes may specify higher minimum ratings.

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.