WSHP Annual Inspection
This form is based off of Hansen's 2021 PM
WSHP Annual Inspection
This form is based off of Hansen's 2021 PM
Unit #
Date
Company and Tech performing Work
1. Compressor Area
Suction (Required only if Delta T is Low)
Discharge (Required only if Delta T is Low)
Compressor LRA
Compressor RLA
Compressor Amps (Average)
Compressor Amps 2 (if there is a second compressor)
Fan Run Capacitor Rated
Fan Run Capacitor Actual
Fan Motor FLA
Fan Motor Actual
Control Board Burn Mark
Contactor
Disconnect
2. Evaporator
Drain Clear
Pan Treatment
Evap Coil Clean
Delta T: Supply
Delta T: Return
Circ Pumps
Circulation Pump amps Actual
Circulation Pump amps Actual #2
Circulation Pump amps Rated
Water In Temp
Water Out Temp
Estimated Cost to Repair as Needed
$
Notes
Fail if a part is bad and needs replacement, or the unit isn't running correctly. This will send corrective action ticket to Rob and Morgan.
Comments
Source: Phoenix West 2 (Community Member)