Hot Work Permit Inspection Guidelines

This procedure ensures the work area and all adjacent area where sparks and heat might have affected are inspected.
MaintainX
07/22/2022

Hot Work Permit Inspection Guidelines

This procedure ensures the work area and all adjacent area where sparks and heat might have affected are inspected.

    Date:

    Time Hot Work Began:

    Time Hot Work Ended:

    Location (Area and/or Line):

    Nature of Hot Work (Welding, Cutting, etc.):

    Print Name/Company of Person Conduction Hot Work:

    Print Name/Company of Designated Fire Watch:

    This certifies that the work area and all adjacent area where sparks and heat might have affected were inspected during Hot Work operation and for 30 minutes after work stopped to ensure no fires were generated as a result of the Hot Work performed

    Signature of Designated Fire Watch:

    Click here to sign

    This certifies that I have verified the nature and duration of the Hot Work, and all appropriate precautions have been followed.

    Supervisor/Team Leader/Designated Trained Contractor:

    Hot Work performed in a Hot Work High Hazard Area requires an additional authorizing signature. Combustibles must be moved or covered within 50 feet and non-working fire watch is required.

    Manager/Designated Person by Site Manager:

    Required Precautions with 35 feet of all Hot Work Operations

    Sprinklers are in service

    • Pass
    • Flag
    • Fail

    Fire extinguishers are available

    • Pass
    • Flag
    • Fail

    Hot Work equipment is in good repair

    • Pass
    • Flag
    • Fail

    It is not possible to perform work in the maintenance shop

    • Pass
    • Flag
    • Fail

    All flammable liquids removed from area

    • Pass
    • Flag
    • Fail

    All product (or chemical) dust/build-up removed. All oil removed. This includes food grade oil (orange/lemon oil

    • Pass
    • Flag
    • Fail

    All combustible liquids removed or protected with fire-resistant tarps

    • Pass
    • Flag
    • Fail

    Floors are swept and clear of debris

    • Pass
    • Flag
    • Fail

    Nearby personnel and equipment protected from sparks though the use of screens, barriers, and fire-resistant tarps

    • Pass
    • Flag
    • Fail

    If welding on walls, construction is noncombustible and without combustible covering or insulation

    • Pass
    • Flag
    • Fail

    If welding on metal walls, combustibles are removed form the opposite wall

    • Pass
    • Flag
    • Fail

    All wall and floor openings are covered

    • Pass
    • Flag
    • Fail

    Enclosed equipment is cleared of all combustibles

    • Pass
    • Flag
    • Fail

    If welding on a grate overhead, there are fire watchers at both levels

    • Pass
    • Flag
    • Fail

    Other affected Supervisor and/or Team Leaders were notified of this work

    • Pass
    • Flag
    • Fail
Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.