CLT PM Program - Dryer Baghouse (Dryer Area) - 6 Mos.
The CLT PM Program - Dryer Baghouse (Dryer Area) - 6 Mos. Form is mainly to check the safety of your equipment by following LOTO procedures. There's a step-by-step procedure which anyone can easily follow for thorough inspection of your equipment. Essentially, the form helps you in ensuring that your equipment is always at its peak. It inspects the following: Bulk Silo Screen, Air Dryer, and Interior Baghouse.
CLT PM Program - Dryer Baghouse (Dryer Area) - 6 Mos.
The CLT PM Program - Dryer Baghouse (Dryer Area) - 6 Mos. Form is mainly to check the safety of your equipment by following LOTO procedures. There's a step-by-step procedure which anyone can easily follow for thorough inspection of your equipment. Essentially, the form helps you in ensuring that your equipment is always at its peak. It inspects the following: Bulk Silo Screen, Air Dryer, and Interior Baghouse.
Safety
Did you follow all LOTO procedures?
Task Instructions:
Bulk Silo Screen (3rd Floor)
Air-Dryer (Compressor Room)
Interior Baghouse (Dryer Area)
List extra parts extra parts and comments here
Does this equipment pass your inspection?
Additional comments or reason additional work is needed?
Add Pictures as needed (additional pictures can be placed in the comments section)
Add or drag pictures
Your Name
Your signature here
Click here to sign
Source: Conair