CLT PM Program - Warehouse Fans (New Warehouse) - 2 Mos.
The CLT PM Program - Warehouse Fans (New Warehouse) - 2 Mos. Inspection Form is mainly to check the safety of your equipment by following LOTO procedures. There's a step-by-step procedure which anyone can easily follow for thorough inspection of your equipment. Essentially, the form helps you in ensuring that your equipment is always at its peak.
CLT PM Program - Warehouse Fans (New Warehouse) - 2 Mos.
The CLT PM Program - Warehouse Fans (New Warehouse) - 2 Mos. Inspection Form is mainly to check the safety of your equipment by following LOTO procedures. There's a step-by-step procedure which anyone can easily follow for thorough inspection of your equipment. Essentially, the form helps you in ensuring that your equipment is always at its peak.
Safety
Did you follow all LOTO procedures?
Task Instructions:
Horizontal Belt Conveyor (Old Warehouse)
PLS General Assembly (Old Warehouse)
PLS Turntable (Old Warehouse)
Lift Forks Turntable (Old Warehouse)
Layer Pusher (Old Warehouse)
Lower Layer Pusher (Old Warehouse)
End Stop Plate (Old Warehouse)
Driven End Stop (Old Warehouse)
Pallet Live Rollers -3pcs (Old Warehouse)
Wulftec-New (Old Warehouse)
List extra parts extra parts and comments here
Does this equipment pass your inspection?
Additional comments or reason additional work is needed?
Add Pictures as needed (additional pictures can be placed in the comments section)
Add or drag pictures
Your Name
Your signature here
Click here to sign
Source: Conair