JLG Vertical Mast Power Tower Duo: Pre-Operation Checklist
Use this checklist and inspection form at the beginning of each workshift or at each change of operator.
JLG Vertical Mast Power Tower Duo: Pre-Operation Checklist
Use this checklist and inspection form at the beginning of each workshift or at each change of operator.
Visual Inspection: Carry out a thorough visual inspection of the machine. Look specifically for any signs of damage to:
DO NOT USE THE MACHINE if any of the above items are faulty or not working. NORMAL OPERATION Use the machine internally or externally, on hard, level surfaces sloping up to 3°, and able to support the machine and safe working load.