Weekly Production Area Preventive Maintenance
Use this procedure for a weekly check on your production are specifically on robot tooling, vacuum systems and dust collection systems. This is needed to ensure your production operates properly.
Weekly Production Area Preventive Maintenance
Use this procedure for a weekly check on your production are specifically on robot tooling, vacuum systems and dust collection systems. This is needed to ensure your production operates properly.
Robot Tooling- Ensure all tooling for robots are secure and in good condition.
Robot Vacuum Systems - Change vacuum cups as necessary and clean out vacuum system
Dust Collection Systems - Inspect ALL dust collection piping and pick up points for proper flow and operation
Attachment for HSTS and HSGL Palletizer Tooling
Source: 2730 ATLC - Custom Building Products (Community Member)