Back

Weekly Production Area Preventive Maintenance

Use this procedure for a weekly check on your production are specifically on robot tooling, vacuum systems and dust collection systems. This is needed to ensure your production operates properly.
2730 ATLC - Custom Building Products
05/01/2024

Weekly Production Area Preventive Maintenance

Use this procedure for a weekly check on your production are specifically on robot tooling, vacuum systems and dust collection systems. This is needed to ensure your production operates properly.

    Robot Tooling- Ensure all tooling for robots are secure and in good condition.

    Robot Vacuum Systems - Change vacuum cups as necessary and clean out vacuum system

    Dust Collection Systems - Inspect ALL dust collection piping and pick up points for proper flow and operation

    Attachment for HSTS and HSGL Palletizer Tooling

    Source: 2730 ATLC - Custom Building Products (Community Member)

    Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.