Back

15. Daikin Roofpak Heating and Cooling 015C–105C: Maintenance

This monthly procedure is for your equipment's control box, cooling circuits and gas furnace. The complete steps on how to check the unit has been given so you can check your unit thoroughly.
MaintainX
10/24/2021

15. Daikin Roofpak Heating and Cooling 015C–105C: Maintenance

This monthly procedure is for your equipment's control box, cooling circuits and gas furnace. The complete steps on how to check the unit has been given so you can check your unit thoroughly.

    Cabinet Sections

    Once a month, open a door on each section and verify that no moisture or debris is accumulating in the unit.

    Cooling Circuits

    The steps below are necessary only if the unit has been started.

    Gas Furnace

    If the unit is equipped with a gas furnace, close the gas shutoff valve and open furnace control switch S3.

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.