15. Daikin Roofpak Heating and Cooling 015C–105C: Maintenance
This monthly procedure is for your equipment's control box, cooling circuits and gas furnace. The complete steps on how to check the unit has been given so you can check your unit thoroughly.
15. Daikin Roofpak Heating and Cooling 015C–105C: Maintenance
This monthly procedure is for your equipment's control box, cooling circuits and gas furnace. The complete steps on how to check the unit has been given so you can check your unit thoroughly.
Cabinet Sections
Once a month, open a door on each section and verify that no moisture or debris is accumulating in the unit.
Cooling Circuits
The steps below are necessary only if the unit has been started.
Gas Furnace
If the unit is equipped with a gas furnace, close the gas shutoff valve and open furnace control switch S3.