Back

RTFO Oven Verification Record

PTQM-FO-020.03 This test is crucial because it helps you investigate then predict HMA pavement behavior, longevity, and distress. So the engineer needs to do this test before constructing any pavement. So it is also essential to choose the high-quality RTFOT rolling thin film oven test equipment.
Ergon - Lubbock 14842
06/19/2024

RTFO Oven Verification Record

PTQM-FO-020.03: This test is crucial because it helps you investigate then predict HMA pavement behavior, longevity, and distress. So the engineer needs to do this test before constructing any pavement. So it is also essential to choose the high-quality RTFOT rolling thin film oven test equipment.

    Verified By

    Date

    Calibration Equipment

    ASTM 13C thermometer S/N:

    Verified digital timer S/N:

    Caliper S/N:

    Level S/N:

    Thermometer

    Thermometer 13C Kessler S/N:

    Distance from thermometer bulb to right side of the over (2 +/- 3/8 in)

    Bulb level with carriage axis within 25 mm (1 in)

    • Yes
    • No
    • N / A

    Apparatus

    Rotation rate (15.0 +/2 0.2 RPM or 15 rev/60 +/- 0.8 sec)

    Distance of air jet orifice to open end of sample container (6.4 +/- 0.8mm or 1/4 +/- 1/16in)

    Flow meter standardized every 12 months (4000 +/- 100 mL/min)

    • Yes
    • No
    • N / A

    Check horizontal axis of the bottles in the carriage level within +/- 1 degree)

    • Pass
    • Flag
    • Fail

    Temp Controlling System

    Temperature recovery time to 163 +/- 1 degree C within 10 minutes

    • Yes
    • No
    • N / A

    Time to temp

    Temp at 0.5 hr (C)

    Temp at 1.0 hr (C)

    Temp at 1.5 hr (C)

    RTFO Maintenance

    As needed

    Grease the chain

    • Yes
    • No
    • N / A

    Rinse the flow meter w/ Xylene & Acetone

    • Yes
    • No
    • N / A

    Remove air nozzle and clean

    • Yes
    • No
    • N / A

    Air orifice (0.965-1.067 mm)

    • Pass
    • Flag
    • Fail

    Replace carriage bushing

    • Yes
    • No
    • N / A

    Check that nozzle and bottle gap is 1/4 inches

    • Pass
    • Flag
    • Fail

    Check fan bearing

    • Pass
    • Flag
    • Fail

    Ensure that carriage is level according to T240

    • Pass
    • Flag
    • Fail

    Action Recommended

    Comments

Source: Ergon - Lubbock 14842 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.