Cold Generator™ Scroll Chillers CGWR Series - Monthly Maintenance
This procedure is the recommended monthly maintenance procedure for your equipment. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Cold Generator™ Scroll Chillers CGWR Series - Monthly Maintenance
This procedure is the recommended monthly maintenance procedure for your equipment. Performing all maintenance procedures and inspection at the recommended intervals will prolong the life of your chiller and minimize the possibility of malfunctions.
Once the unit has been operating for about 10 minutes and the system has stabilized, check operating conditions and complete the checkout procedures that follow.
Note: A superheat calculated value is incorporated into the unit controller.
Source: Trane (www.trane.com)