Back

York ECO2® YPAL 050-061 Commercial Rooftop HVAC (3-6 Months Maintenance)

The York ECO2® YPAL 050-061 Commercial Rooftop HVAC (3-6 Months Maintenance) has easy to follow step by step instructions on how to easily identify components that require repair or replacement. Use this procedure to preserve the quality of your machine.
MaintainX
04/26/2021

York ECO2® YPAL 050-061 Commercial Rooftop HVAC (3-6 Months Maintenance)

The York ECO2® YPAL 050-061 Commercial Rooftop HVAC (3-6 Months Maintenance) has easy to follow step by step instructions on how to easily identify components that require repair or replacement. Use this procedure to preserve the quality of your machine.

    DANGER: Disconnect and lock-out power from the unit anytime service is being performed on the fan section. Failure to do so could result in serious injury or death due to the fan turning on while work is in progress.

    CAUTION : Squealing belts during starting is caused by slipping belts that are not tensioned properly

    Motor Bearing Lubrication

    Belt Tension

    CAUTION: Never use excessive belt tension, as this could result in damaging the bearing, motor pulleys or motor base. See drive label on fan housing adjacent to drive for specific details on tension.

Source: York

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.