DAILY BUILDING WALKTHROUGH
Maintenance employees are in charge of two floors to inspect daily, as well the chief engineer has to inspect other areas like boilers, pumps, etc
DAILY BUILDING WALKTHROUGH
Maintenance employees are in charge of two floors to inspect daily, as well the chief engineer has to inspect other areas like boilers, pumps, etc
CHIEF ENGINEER WALKTHROUGH
FIRST FLOOR (1ST)
SECOND FLOOR (2ND)
THIRD FLOOR (3RD)
FORTH FLOOR (4TH)
FIFTH FLOOR (5TH)
SIXTH FLOOR (6TH)
SEVENTH FLOOR (7TH)
EIGHTH FLOOR (8TH)
NINETH FLOOR (9TH)
TENTH FLOOR (10TH)
ELEVENTH FLOOR (11TH)
PH FLOOR (PH)
Lobby
Roof Tops
Source: AVENTURA BEACH CLUB CONDOMINIUM (Community Member)