4-Person High Speed (Detachable) Drive Terminal Pre-ops
Required procedure including required checklists, inspections and meter readings
4-Person High Speed (Detachable) Drive Terminal Pre-ops
Required procedure including required checklists, inspections and meter readings
General
Date & Time
Hours
Control Voltage (V)
Control Amperage (A)
Weather
Motor Room
* = Visual Inspection
Brake Motor ON
Brake motor Voltage (V)
Brake motor Amperage (A)
Entry brush down/up per Weather Conditions
Accel/ Decel Belts, Tires, Rails
PTO Belts, Sheaves
Safety/ Limit Switches Exercised & Reset
Drive Machinery belts, mounts, alignment
Gear Box oil level
Planetary oil level
Battery Chargers
Batteries
*Fire Extinguishers; Present, Charged
*Auxiliary
* = Visual Inspection
Fuel Level
Fuel transfer pump functioning
Oil, Coolant, ATF levels/ leaks
Block Heater functioning
Coupling: Instructions, chain, master link, cotters, pliers
Brakes
* = Visual Inspection
Oil Level
*Inspect All Brakes
*Breaking surfaces, pads & hoses
*Operating position for bypass levers
*High Speed Backstop in Operating Position
Controls
Exercise & Reset STOP buttons x4
Exercise & Reset EMERGENCY STOP x4
Stop Gate operating position & functional
Tower Circuit switch = Both
Run lift on Med 2x longest span before Fast
Lift Speed on Fast FPM
Stopping Distance from Fast STOP
Stopping Distance from Fast Emergency Stop
Secure Seat Inspection complete
Test designated controls while running
Notes
Date
Signature
Click here to sign
Source: Stevens Pass (Community Member)