General Pump Inspection and Maintenance Schedule: 8000 Hours or 12 Months

This annual maintenance checklist will ensure your equipment is always running at peak performance levels and prevent unscheduled downtime. Preventive maintenance is that it enables you to catch problems well ahead of time or in some cases, predict an issue long before it even starts.
MaintainX
09/16/2022

General Pump Inspection and Maintenance Schedule: 8000 Hours or 12 Months

This annual maintenance checklist will ensure your equipment is always running at peak performance levels and prevent unscheduled downtime. Preventive maintenance is that it enables you to catch problems well ahead of time or in some cases, predict an issue long before it even starts.

    Actions required only for specific pump types are so noted. The symbol () used in the table below indicates that the action indicated may not be applicable to a specific pump of a particular type.

    Clean packing box

    • Pass
    • Flag
    • Fail

    Check and flush seal water and drain piping

    • Pass
    • Flag
    • Fail

    Perform a comparative field test (flow, pressures, and power) with calibrated instruments. Restore internal running clearances if results are unsatisfactory (install new wear rings).

    • Pass
    • Flag
    • Fail

    Perform a comparative vibration test.

    • Pass
    • Flag
    • Fail

    Remove packing and inspect sleeve(s). Replace if worn. (packed pumps) 

    • Pass
    • Flag
    • Fail

    Realign coupled pumps (maintain records) 

    • Pass
    • Flag
    • Fail

    Remove pump handhole covers and inspect impeller for corrosion and excessive wear (sewage pumps) 

    • Pass
    • Flag
    • Fail

    Remove handhole covers to inspect the wear ring clearances. When the wear ring clearances have doubled, adjust the ring clearances to original specifications if so supplied or install new wear rings (sewage pumps).

    • Pass
    • Flag
    • Fail

    Examine running clearance between propeller and propeller housing. When the running clearance has doubled, repair or replace the housing, housing liner, or propeller as appropriate. (model AFV axial flow pumps) 

    • Pass
    • Flag
    • Fail

    Inspect the impeller running clearance. Inspect the impeller housing for excessive wear. If the wear is not excessive, perform impeller adjustment. If the wear is excessive, repair or replace the impeller housing. (open impeller mixed flow pumps, such as models SAF, SAFV, SAFH, or TMF) 

    • Pass
    • Flag
    • Fail
Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.