Back

JLG Vertical Mast Nano SP Plus: Pre-Operation Checklist

As with all heavy equipment, it’s important to inspect and maintain your and vertical mast to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.
MaintainX
10/12/2022

JLG Vertical Mast Nano SP Plus: Pre-Operation Checklist

As with all heavy equipment, it’s important to inspect and maintain your and vertical mast to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.

    Visual Inspection: Carry out a thorough visual inspection of the machine. Look specifically for any signs of damage to:

    Ensure battery is charged by checking joystick LED light (green = charged).

    Ensure hydraulic oil level is at correct level. Do not over fill. Check for hydraulic leaks.

    Check machine functions are working correctly before normal use:

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.