79907 | Fibercel TN1 Wire Belt PM Monthly
Use this procedure for a successful preventive maintenance program that extends construction equipment life and minimizes unscheduled downtime caused by equipment breakdown.
79907 | Fibercel TN1 Wire Belt PM Monthly
Use this procedure for a successful preventive maintenance program that extends construction equipment life and minimizes unscheduled downtime caused by equipment breakdown.
Date
Equipment I.D
Location
Crew Member
Downtime/Runtime
Check for alignment and overall functionality of belt.
Inspect belt for damage, broken links, bent rods. Repair s needed.
Inspect bearings. Check for excessive wear and play.
Inspect tensioners for functionality. Adjust if needed. Check for damages and wear.
Inspect frame. Check for damage, broken bolts, and wear.
Check oiler for blockage and functionality. Fill as needed.
Check oiler for blockage and functionality. Fill as needed.
Source: MaintainX (Community Member)