Shop Garage Door LOTO Procedure: Construction Electrical
This Lock out/Tag Out procedures establish the minimum requirements for lockout/tagout (LO/TO) on equipment that is being serviced or maintained. This procedure must be followed in order to properly stop equipment, disconnect it from any sources of potentially hazardous energy, and prevent those sources from being reconnected during the work.
Shop Garage Door LOTO Procedure: Construction Electrical
This Lock out/Tag Out procedures establish the minimum requirements for lockout/tagout (LO/TO) on equipment that is being serviced or maintained. This procedure must be followed in order to properly stop equipment, disconnect it from any sources of potentially hazardous energy, and prevent those sources from being reconnected during the work.
ENERGY SOURCES
Energy Source (Magnitude):
Energy Isolation Point or Control Step:
Application Method and LOTO Device
Step #
LOCKOUT TAGOUT SEQUENCE
Notify Employees
Equipment Shutdown
Isolate Energy
Lockout Energy
Dissipate Energy
Verify Isolation
Perform work
RESTORE EQUIPMENT TO SERVICE SEQUENCE
Clear Work Area
Verify Controls
Remove Lockout
Notify Employees