Back

JLG Vertical Mast 25AM: Daily Walk-Around Inspection

As with all heavy equipment, it’s important to inspect and maintain your telehandlers to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.
MaintainX
10/13/2022

JLG Vertical Mast 25AM: Daily Walk-Around Inspection

As with all heavy equipment, it’s important to inspect and maintain your telehandlers to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.

    Front Caster Wheels

    Rear Wheels

    Tiltback Wheels

    Base Frame

    Tilt Back Assembly

    Battery/Charger Box Assembly

    Outrigger Interlock Indicator LED’s

    Outrigger Sockets

    Outrigger Beams

    Motor/Pump/Reservoir Power Unit

    Manual Release Control Valve

    Ground Controls

    Mast Assembly

    Platform Rail Installation

    Platform Assembly

    Platform Controls

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.