Back

Toyota Electric Forklift FBMF 16-30: Semi-Annual or Every 1000 Hours Maintenance

The benefits of preventive maintenance for heavy equipment outweigh the time you need to spend for daily inspections and scheduled services. It can help you prolong the life of your equipment, keep track of your project's schedule, save money, and keep your workers safe.
MaintainX
11/15/2022

Toyota Electric Forklift FBMF 16-30: Semi-Annual or Every 1000 Hours Maintenance

The benefits of preventive maintenance for heavy equipment outweigh the time you need to spend for daily inspections and scheduled services. It can help you prolong the life of your equipment, keep track of your project's schedule, save money, and keep your workers safe.

    Inspection Method:

    I = Inspection⋅Repair or replacement if required.

    M = Measurement⋅Repair or adjustment if required.

    T = Measurement

    C = Cleaning

    L = Lubrication

    ELECTRICAL SYSTEM

    Motor: I

    Steering System

    Gear box: C

    Hydraulic System

    Hydraulic oil tank: C

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.