CHICAGO Folder Weekly Preventive Maintenance
Regular inspections and maintenance should be scheduled. Flatwork Folders should be emptied and broken down to remove the buildup of dust and feed grime inside and outside to prolong use and efficiency.
CHICAGO Folder Weekly Preventive Maintenance
Regular inspections and maintenance should be scheduled. Flatwork Folders should be emptied and broken down to remove the buildup of dust and feed grime inside and outside to prolong use and efficiency.
*** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***
All hazardous energy has been isolated using LOTO procedures?
All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?
General Inspection
Observe machine running, watch and listen for abnormal conditions
Test all e-stops and safety devices
Lock Out Tag Out
LOTO Performed
Clean Machine
Use compressed air to clean exterior of machine then wipe down with degreaser
Vacuum / Blowout inside control panels including VFD's and cooling fans
Wipe down sensor faces and reflectors with microfiber cloth
Check for and remove any string accumulation on bearings and rollers
De-energized Inspection
Inspect air filter/auto drain
Check all air gauges/pressure regulators are working and set to proper PSI
Return Machine to normal operation
Remove LOTO, start machine and ensure proper operation
Source: 605 Yakima WA - Cintas (Community Member)