Braun Open Pocket Washer Annual PM
Routine maintenance maximizes operating efficiency and minimizes downtime. The maintenance procedures described below will prolong the life of the machine and help prevent accidents.
Braun Open Pocket Washer Annual PM
Routine maintenance maximizes operating efficiency and minimizes downtime. The maintenance procedures described below will prolong the life of the machine and help prevent accidents.
*** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***
All hazardous energy has been isolated using LOTO procedures?
All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?
Lock Out Tag Out
LOTO Performed
Utilize the Cintas ENERGY CONTROL PROGRAM Checklist when applying LOTO.
Check Brake Linings - If applicaple, check brake linings. Replace if needed. Appendix 1
Check Electrical Connections - Check All electrical connections in the Main Control Panel and on the Inverter
Replace shock absorbers - Replace all shock absorbers and date each one
Change fluid & filter - Change hydraulic fluid; install new filter. See Appendix 2.
Test motor - Test electric motor insulation for breakdown. Replace friction tape if damaged. Perform an amp draw.
Chute - Replace the quick exhaust air filter. Braun part number#P02300003. See Appendix 3.
Cleanup - Clean up all tools, parts, and debris from the work area.
Note Repairs Made or Needed. Generate Corrective Work Order for Needed Repairs.
Source: 24P DC Columbus - Cintas (Community Member)