Daikin NAVIGATOR® WATER-COOLED SCREW CHILLER (WMV): Monthly Maintenance
This monthly procedure should only be performed by an owner personnel. This focuses on the microtech controls, condenser and evaporator.
Daikin NAVIGATOR® WATER-COOLED SCREW CHILLER (WMV): Monthly Maintenance
This monthly procedure should only be performed by an owner personnel. This focuses on the microtech controls, condenser and evaporator.
Operation
General:
Electrical ( * including the VFDs)
Evaporator and Condenser (water-cooled)
NOTE: 1 Monthly operations include all weekly operations. 2 Annual (or spring startup) operations include all weekly and monthly operations. 3 Log readings can be taken daily for a higher level of unit observation. 4 Replace the filter if pressure drop exceeds 20 psi. 5 The weekly fan filter cleaning schedule can be modified to meet job conditions. It is important that the filter allows full air flow.
Source: MaintainX (Community Member)