Jensen Autosort Conveyor Metristore Quarterly PM
This procedure outlines the quarterly preventive maintenance (PM) tasks for the Jensen Autosort Conveyor Metristore. Each task is designed to ensure the conveyor system operates efficiently and safely, with specific instructions for inspection, cleaning, lubrication, and repair as needed.
Jensen Autosort Conveyor Metristore Quarterly PM
This procedure outlines the quarterly preventive maintenance (PM) tasks for the Jensen Autosort Conveyor Metristore. Each task is designed to ensure the conveyor system operates efficiently and safely, with specific instructions for inspection, cleaning, lubrication, and repair as needed.
*** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***
All hazardous energy has been isolated using LOTO procedures?
All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?
Lock Out Tag Out
LOTO Performed
Machine Observation
Energy Control Program
Perform LOTO in accordance with the LOTO Risk Assessment.
Chain
Check chain tension. See Appendix 1.
Clean chain of excess dirt and dust.
Lubricate Chain. See Appendix 1.
Motor
Check that motor is properly ventilated ( Free from Lint) See Appendix 2 Fan Cover
Rail
Clean all rail slides.
Chain
Inspect and clean Glide bearing assemblies at each end of the Metristore conveyor.
Inspect for damaged or worn bearing assembly.
Repair made or needed:
Source: 011 Strongsville OH (Community Member)