Frequent Checklist: Daily/Rigging & Sling Pre-use Inspections
By using this pre-use checklist, it will help you minimize project delays and unproductivity, lower maintenance costs, and reduce recurring problems.
Frequent Checklist: Daily/Rigging & Sling Pre-use Inspections
By using this pre-use checklist, it will help you minimize project delays and unproductivity, lower maintenance costs, and reduce recurring problems.
Inspection Date
Inspector (print/sign name)
Name or trademark of manufacturer
Manufacturer’s code or stock number
Rated capacities for the three basic hitches (vertical, choker, vertical basket)
Core fiber type – if cover(s) is of a different fiber type, both fiber types must be identified
Length (reach) – bearing point to bearing point
Each manufacturer must internally identify their product with name or trademark for traceability
Slings are removed from service if any of the following defects are visible:
Missing or illegible sling identification
Acid or caustic burns
Melting or charring of any part of the surface
Snags, punctures, tears, cuts or abrasive wear that expose the core yarns
Broken or worn stitches in the cover which exposes the core yarns
Wear or elongation exceeding the amount recommended by the manufacturer
Stretched, cracked, worn, pitted or distortion of fittings
Knots in any part
Source: MaintainX (Community Member)