Back

Scotsman Ice Maker SCC50 Descaling Process: Semi-Annual

Preventive Maintenance (PM) is the key to maximum running efficiency, less down time, and longer life out of an ice machine. Use this checklist for the primary items that need to be checked during the semi-annual preventive maintenance.
MaintainX
10/08/2022

Scotsman Ice Maker SCC50 Descaling Process: Semi-Annual

Preventive Maintenance (PM) is the key to maximum running efficiency, less down time, and longer life out of an ice machine. Use this checklist for the primary items that need to be checked during the semi-annual preventive maintenance.

    Planned Maintenance: Ice Machines require periodic maintenance to be able to deliver like-new reliable performance.

    Schedule: Typically twice per year for scale removal and sanitizing. At some sites the water supply to the ice machine will contain significant quantities of minerals, and that will result in a water system becoming coated with these minerals, requiring more frequent maintenance than twice per year.

    • Screenshot2021-07-03at8.28.56AM.png
    • Screenshot2021-07-03at8.28.23AM.png
Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.