Back

End of Day Walk Through

End of Day Inspection Walk Throughs in the work place help prevent incidents, injuries and illnesses. Through a critical examination of the workplace, inspections help to identify and record hazards for corrective action. Health and safety committees can help plan, conduct, report and monitor inspections. Regular workplace inspections are an important part of the overall occupational health and safety program and management system, if present.
Ergon -
03/12/2024

End of Day Walk Through

End of Day Inspection Walk Throughs in the work place help prevent incidents, injuries and illnesses. Through a critical examination of the workplace, inspections help to identify and record hazards for corrective action. Health and safety committees can help plan, conduct, report and monitor inspections. Regular workplace inspections are an important part of the overall occupational health and safety program and management system, if present.

    Date/Time

    Operator

    HEATERS

    AMERICAN HEATER

    Temperature

    Set Point

    Line PSI

    Tank PSI

    SMALL HEATER

    Temperature

    Set Point

    PSI

    LARGE HEATER

    Temperature

    Set Point

    PSI

    NORTH HEATER

    Temperature

    Set Point

    PSI

    CHECK SIGHT TUBE ON HEATER EXPANSION TANK FOR OIL LEVEL ON ALL HEATERS

    Sight Tube Level OK

    HOT OIL BOOSTER PUMPS

    AC HOT OIL BOOSTER PUMP

    Outlet Temperature

    Set Point

    EMULSION HOT OIL BOOSTER PUMP

    Outlet Temperature

    Set Point

    RESET IF RED LIGHT IS FLASHING ON BOOSTER SKID

    Booster Reset

    • Pass
    • Flag
    • Fail

    HOT OIL TRACE BOOSTERS

    LARGE HOT OIL TRACE BOOSTER PUMP SOUTH OF TANK 17

    Status

    HOT OIL TRACE BOOSTER SOUTH OF TANK 17

    Status

    HOT OIL TRACE BOOSTER NORTH OF SMALL HEATER ON COLUMN

    Status

    HOT OIL TRACE BOOSTER WEST OF LETDOWN 3 UNDER PIPES

    Status

    HOT OIL TRACE BOOSTER WEST OF SIEFER MILL ON COLUMN

    Status

    HOT OIL TRACE BOOSTER ON TOP OF AC RACK

    Status

    CHECK ALL BRANCH HEATING LINES AND PUMPS FOR OPERATING TEMPERATURES

    TANK 19 (PPA SKID)

    Status

    All Temperatures Acceptable

    PAD 1

    Temperature

    Set Point

    PAD 2

    Temperature

    Set Point

    SKID LINES

    Temperature

    Set Point

    INJECTION LINES

    Temperature

    Set Point

    RESET IF RED LIGHTS ARE ILLUMINATED NEXT TO TEMPERATURE CONTROLLERS

    Skid Reset

    AC TANKS

    TANK 1 (58-28)

    Status

    Temperature Acceptable

    TANK 2 (58-28)

    Status

    Temperature Acceptable

    TANK 3 (64-34)

    Status

    Temperature Acceptable

    TANK 4 (EMPTY)

    Status

    Temperature Acceptable

    TANK 5 (58-28)

    Status

    Temperature Acceptable

    TANK 16 (FLUX)

    Status

    Temperature Acceptable

    TANK 17 (64-22)

    Status

    Temperature Acceptable

    ADDITIVE

    TANK 18 (P25 EVOTHERM)

    Status

    Temperature Acceptable

    LETDOWNS

    LETDOWN 1 (6LD1)

    Status

    Temperature Acceptable

    LETDOWN 2 (7LD2)

    Status

    Temperature Acceptable

    LETDOWN 3 (8)

    Status

    Temperature Acceptable

    LETDOWN 4 (9REACT)

    Status

    Temperature Acceptable

    MIX TANKS

    MIX TANK 1

    Status

    Temperature Acceptable

    MIX TANK 2

    Status

    Temperature Acceptable

    EMULSION TANKS

    TANK 201

    Status

    Temperature Acceptable

    TANK 202

    Status

    Temperature Acceptable

    TANK 203

    Status

    Temperature Acceptable

    TANK 204

    Status

    Temperature Acceptable

    TANK 205

    Status

    Temperature Acceptable

    TANK 206

    Status

    Temperature Acceptable

    TANK 207

    Status

    Temperature Acceptable

    TANK 208

    Status

    Temperature Acceptable

    TANK 209

    Status

    Temperature Acceptable

    TANK 210

    Status

    Temperature Acceptable

    TANK 211

    Status

    Temperature Acceptable

    TANK 212

    Status

    Temperature Acceptable

    CHEMICAL TANKS

    C5 (AA-89)

    Status

    Temperature Acceptable

    C6 (EMPTY)

    Status

    Temperature Acceptable

    C7 (EMPTY)

    Status

    Temperature Acceptable

    C8 (MBG)

    Status

    Temperature Acceptable

    REPORT ANY UNACCEPTABLE TEMPERATURES TO FACILTY MANAGER OR LEAD OPERATOR IMMEDIATELY

    L9 (LATEX)

    Status

    L10 (LATEX)

    Status

    HCL-11 (HYDROCHLORIC ACID)

    Status

    SOLUTION TANK 1 (RAPID SET)

    Status

    SOLUTION TANK 2 (SLOW SET)

    Status

    HOT WATER TANK

    Status

    DURING COLD WEAHTHER CLOSE MAIN WATER VALVE AND DRAIN ALL WATER LINES: (HOT, COLD, LOAD RACK, SOLUTION TANK LINES, STATIONARY SAFETY EYEWASH/SHOWER STATIONS)

    MISCELLANEOUS

    Status

    AIR COMPRESSOR

    Status

    MOBILE EQUIPMENT

    Status

    Report Condition Of Equipment To Be Corrected Or Repaired

    Operator Signature

    Click here to sign

    AC RACK FANS

    Click here to sign
Source: Ergon - (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.