Back

Kannegiesser Ironer Annual PM

Regular ironer maintenance will achieve significant improvements in flatwork productivity, standards of finishing and profitability.
54Q Beaverton OR - Cintas
08/22/2024

Kannegiesser Ironer Annual PM

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Lock Out Tag Out

    Perform LOTO as necessary

    • Yes
    • No
    • N / A

    Food Safety Pre-Check

    Check thermal insulation of the oil heating assembly for integrity

    • Pass
    • Flag
    • Fail

    Check oil heating assembly for integrity and leaks

    • Pass
    • Flag
    • Fail

    Check heating band

    1. inspect thermal insulation 2. inspect for leaks

    • Pass
    • Flag
    • Fail

    Check locking valves for leaks and free spindle movement

    • Pass
    • Flag
    • Fail

    Clean dirt trap on filter of pipe cleaning system.

    • Pass
    • Flag
    • Fail

    The following items will be completed by an Authorized outside contractor.

    Food Safety Post-Check

Source: 54Q Beaverton OR - Cintas (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.