Generac Diesel Generators MMG45IF4: Every 50 Hours (Break-In Period) Maintenance (Isuzu Engine)
This procedure is for the basic maintenance of your equipment by replacing the engine oil and filter and oil filter element replacement. By followig the recommended interval maintenance procedure, this will help ensure that your equipment performs at its most efficient for a long period of time.
Generac Diesel Generators MMG45IF4: Every 50 Hours (Break-In Period) Maintenance (Isuzu Engine)
This procedure is for the basic maintenance of your equipment by replacing the engine oil and filter and oil filter element replacement. By followig the recommended interval maintenance procedure, this will help ensure that your equipment performs at its most efficient for a long period of time.
Notice!
Refer to the original equipment manufacturer’s operating manual for a complete list of maintenance requirements. Failure to comply with the procedures as described in the engine operator’s manual will nullify the warranty, decrease performance and cause equipment damage or premature equipment failure.
Use the schedule in the following table as a guide for regular maintenance intervals. For additional or replacement copies of the engine operator’s manual, contact an authorized dealer in your area.
Isuzu Maintenance Procedure:
Source: MaintainX (Community Member)