Allied Z-Series (3 - 5 ZGA): Quarterly Maintenance

This procedure focuses on C-Evaporator Coils ensuring that your equipment is at its optimum for a long period of time.
MaintainX
08/24/2022

Allied Z-Series (3 - 5 ZGA): Quarterly Maintenance

This procedure focuses on C-Evaporator Coils ensuring that your equipment is at its optimum for a long period of time.

    C-Burners

    Periodically examine burner flames for proper appearance during the heating season. Before each heating season, examine the burners for any deposits or blockage which may have occurred.

    Clean burners as follows:

    • Screenshot2021-02-17at9.49.13AM.png
    • Screenshot2021-02-17at9.49.33AM.png

    D-Combustion Air Inducer

    A combustion air proving switch checks combustion air inducer operation before allowing heating sequence to continue. The sequence will not be allowed to continue if inducer is obstructed.

    The combustion air inducer wheel should be checked and cleaned prior to the heating season. It should be examined periodically during the heating season to establish an ideal cleaning schedule. With power supply disconnected, the condition of the inducer wheel can be determined by removing the vent pipe and inspecting the wheel through the outlet opening.

    Clean combustion air inducer as follows:

    E-Flue Passageway and Flue Box

    • Screenshot2021-02-17at9.31.03AM.png
Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.