Back

Walinga Grain Bag Unloader 100 Hours or Annually Maintenance

MaintainX
04/26/2021

Walinga Grain Bag Unloader 100 Hours or Annually Maintenance

    Maintenance Safety

    Follow good shop practices:

    5.1.3 SERVICING INTERVALS

    Fig. 5-9 Blower Reservoirs.

    (*pressure relief valve is optional)

    Fig. 5-10 Vacuum Relief Valve.

    Fig. 5-11 * Pressure Relief Valve.

    Fig. 5-12 Boom Line Seal.

    Fig. 5-13 Flex Hose Seals.

    Reset Airlock every 60000 bushels (1600 tonnes)

Source: Walinga

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.