Back

Walinga Central Vac Systems 6 Months Maintenance

MaintainX
04/26/2021

Walinga Central Vac Systems 6 Months Maintenance

    MAINTENANCE SAFETY

    Follow good shop practices:

    5.1 SERVICE

    5.1.1 FLUIDS AND LUBRICANTS

    Grease:

    Blower Oil:

    • 1.PNG

    Gearbox Oil:

    • 1.PNG

    Storing Lubricants:

    5.1.2 GREASING

    Use the Maintenance Checklist provided to keep a record of all scheduled maintenance.

    Danger: Machine is shown with guards removed for illustrative purposes only. Do not operate with guards removed.

    FIG. 27 DRIVE BELTS

Source: Walinga

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.