Milnor Pony Dryer Annual PM
Preventive Maintenance is the act of performing regularly scheduled maintenance activities to help prevent unexpected failures in the future. It involves taking necessary precautions and actions to prevent accidents or equipment failures from occurring before they happen.
Milnor Pony Dryer Annual PM
Preventive Maintenance is the act of performing regularly scheduled maintenance activities to help prevent unexpected failures in the future. It involves taking necessary precautions and actions to prevent accidents or equipment failures from occurring before they happen.
*** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***
All hazardous energy has been isolated using LOTO procedures?
All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?
Lock Out Tag Out
LOTO Performed:
Food Safety Pre-Check
Perform LOTO in accordance with your risk assessment
Machine Observations
Remove and clean burner tubes. Inspect tubes for damage to the holes. replace tubes if there is any damage to the holes.
Check for leaks in the gas train. Test that all gas valves are not leaking by.
Test all safety switches and thermostats. Replace any safety switches or thermostats that are broken
Adjust the gas and air pressure. Adjust the firing rate. Use a flue gas analyzer to ensure proper tuning. LOTO will have to be removed and must be running to verify burner is working properly after adjustment. Make sure to apply LOTO for additional adjustments after testing burner.
Repairs made or needed.
Food Safety Post-Check
Source: 67P East Buffalo NY (Community Member)