Frequent Checklist: Daily Hoist Pre-use Inspections
By using this pre-operation checklist, it will help you minimize project delays and unproductivity, lower maintenance costs, and reduce recurring problems.
Frequent Checklist: Daily Hoist Pre-use Inspections
By using this pre-operation checklist, it will help you minimize project delays and unproductivity, lower maintenance costs, and reduce recurring problems.
CRANE/HOIST ID:
LOAD RATING
OPERATOR/INSPECTOR
DEPT. /OWNER:
DATE/TIME
DESCRIBE TASK/PLANNED LIFT:
Has the crane/hoist and rigging been visually inspected and found to be safe for use prior to the beginning of any lifting work?
Is the load chart clearly visible to the operator?
Is the rated capacity visibly marked on the crane?
Has the load been calculated and verified to be below the limits of the hoist and rigging?
Are operating controls clearly identified?
Are the controls operating correctly?
Has the monorail beam been walked and visually checked for broken bolts, loose anchors, etc.
Has the monorail switches been checked for proper operation, broken items, loose anchors, etc.
Does the hoist run along the monorail with smoothly?
Is sufficient illumination provided for the operator to perform the work safely?
Has a lift-plan of action been agreed to by the personnel involved?
Is the path of the operator and stand-by/load positioning person been cleared of slip, trip, and fall obstacles?
Has the lift/travel path been secured or visually marked to prevent entry by anyone?
Notes:
Source: MaintainX (Community Member)