Toyota Electric Forklift 5FGC/5FDC18-30: Annual or Every 2000 Hours Maintenance
The benefits of preventive maintenance for heavy equipment outweigh the time you need to spend for daily inspections and scheduled services. It can help you prolong the life of your equipment, keep track of your project's schedule, save money, and keep your workers safe.
Toyota Electric Forklift 5FGC/5FDC18-30: Annual or Every 2000 Hours Maintenance
The benefits of preventive maintenance for heavy equipment outweigh the time you need to spend for daily inspections and scheduled services. It can help you prolong the life of your equipment, keep track of your project's schedule, save money, and keep your workers safe.
Inspection Method:
I = Inspection⋅Repair or replacement if required.
M = Measurement⋅Repair or adjustment if required.
T = Measurement
C = Cleaning
L = Lubrication
ELECTRICAL SYSTEM
M = Measurement⋅Repair or adjustment if required.
Engine
Engine proper
Fuel system: M
Cooling system: I
POWER TRANSMISSION SYSTEM
Differential: T
Propeller shaft and axle shaft: I
Front axle:I
Rear axle
STEERING SYSTEM
Power steering: I
Knuckle: I
Steering axle: M
Braking System
Parking Brake: I
Master cylinder or brake valve and wheel cylinder: I
Brake drum and brake shoe
Backing plate
Material Handling System
Fork: I (flaw detector)
Mast and fork bracket: I
Hydraulic System
Oil Control Valve: M
Electrical System
Ignition System: I
Safety Devices, Etc.
Muffler: I
Body
Source: MaintainX (Community Member)