Back

Building Electrical Switchgear PM- Every 5 Years

This routine PM helps in averting electrical failures which could lead to downtime or major damage to the equipment. It also helps circumvent risks to human life.
087
08/23/2024

Building Electrical Switchgear PM- Every 5 Years

This routine PM helps in averting electrical failures which could lead to downtime or major damage to the equipment. It also helps circumvent risks to human life.

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Lock Out Tag Out

    LOTO Performed

    Food Safety Pre-Check

    Machine Observation

    Switchgear

    ENERGY CONTROL PROGRAM

    Perform LOTO in accordance with the LOTO risk assessment.

    • Pass
    • Flag
    • Fail

    Requirement

    This PM must be completed by a licensed electrical contractor (certified to work on commercial high voltage) and not a Cintas partner.

    • Pass
    • Flag
    • Fail

    All electrical/arc flash PPE must be used for this process

    • Pass
    • Flag
    • Fail

    Remove covers

    Perform LDL to ensure power is removed.

    • Pass
    • Flag
    • Fail

    Inspect enclosure and structures

    Switchgear Ensure that all enclosure panels, doors and structures are well maintained in accordance with manufacturer's specification. (Appendix 1)

    • Pass
    • Flag
    • Fail

    Inspect enclosure and structures

    Clean all vents and fan grills of all dust and/or dirt accumulation.

    • Pass
    • Flag
    • Fail

    Ensure all ventilation openings are not obstructed/blocked. (Appendix 2)

    • Pass
    • Flag
    • Fail

    Inspect enclosure and structures

    Check integrity of seals and/or gaskets where installed, these should be examined and replaced or repaired as necessary.

    • Pass
    • Flag
    • Fail

    Inspect enclosure and structures

    Electrical equipment rooms or vaults should be clean of dirt and/or dust accumulation and have adequate ventilation.

    • Pass
    • Flag
    • Fail

    Inspect Insulators, supports, and connectors

    Inspect insulators and conductor supports for signs of cracking, broken pieces, and other physical damage or deterioration.

    • Pass
    • Flag
    • Fail

    Inspect Insulators, supports, and connectors

    Clean all loose dirt with lint-free rags. For contaminates that will not remove easily, a solvent approved by the manufacturer may be used.

    • Pass
    • Flag
    • Fail

    Repair made or needed:

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.