HomeIndustries Use Cases PricingResources Book a TourLog In to MaintainXIndustries Use Cases PricingResources Book a TourLog In to MaintainX Back General • InspectionsLPFK ProtoFlow E ProcedureConestoga College - SMART Centre10/09/2024LPFK ProtoFlow E ProcedureCollapse allWARNING: Always wear safety shoes, safety gloves and safety glasses when entering the machine area.Caution: be aware of Setting up the ProtoFlowFor the installation of the deviceTake the oven out of the packaging and remove the plastic bag.The oven must be place on a flat surface of 400x400 mm. There must be at least 400x250 mm free space in front of the oven for opening the drawer.Leave the device unconnected in the working area for such a period that the device adjusts to the temperature conditions in the room.connect the power cord to grounded network socket only.Before using the equipment, ensure that the ductless fume hood above is switched on.Before using the equipment, ensure that the ductless fume hood above is switched on.Starting the ProtoFlowTo use the ProtoFlowTurn ON the ProtoFlow.Open the drawer and install the PCB.Adjust the PCB holder to the PCB dimensions and close the drawer.Use the arrow to navigate between the menu as in the attach image.Use the second attach image to navigate through the menu and configure your profile.Start the processInsert the PCB after the warmup phase is doneOpen the drawer after the reflow phase is doneRemove the PCB after the cooldown phase is doneMore about the LPKF ProtoFlow EFind more information about the ProtoFlow and its usage on the user manualuser-manual-lpkf-protoflow-e.pdfflyer_lpkf_protoflow_e_en.pdfSource: Conestoga College - SMART Centre (Community Member)
Back General • InspectionsLPFK ProtoFlow E ProcedureConestoga College - SMART Centre10/09/2024LPFK ProtoFlow E ProcedureCollapse allWARNING: Always wear safety shoes, safety gloves and safety glasses when entering the machine area.Caution: be aware of Setting up the ProtoFlowFor the installation of the deviceTake the oven out of the packaging and remove the plastic bag.The oven must be place on a flat surface of 400x400 mm. There must be at least 400x250 mm free space in front of the oven for opening the drawer.Leave the device unconnected in the working area for such a period that the device adjusts to the temperature conditions in the room.connect the power cord to grounded network socket only.Before using the equipment, ensure that the ductless fume hood above is switched on.Before using the equipment, ensure that the ductless fume hood above is switched on.Starting the ProtoFlowTo use the ProtoFlowTurn ON the ProtoFlow.Open the drawer and install the PCB.Adjust the PCB holder to the PCB dimensions and close the drawer.Use the arrow to navigate between the menu as in the attach image.Use the second attach image to navigate through the menu and configure your profile.Start the processInsert the PCB after the warmup phase is doneOpen the drawer after the reflow phase is doneRemove the PCB after the cooldown phase is doneMore about the LPKF ProtoFlow EFind more information about the ProtoFlow and its usage on the user manualuser-manual-lpkf-protoflow-e.pdfflyer_lpkf_protoflow_e_en.pdfSource: Conestoga College - SMART Centre (Community Member)