SILO COOLING WATER
TURNING COOLING WATER ON TO SILO'S #201, 202, 203 IN THE SPRING
SILO COOLING WATER
TURNING COOLING WATER ON TO SILO'S #201, 202, 203 IN THE SPRING
ENSURE THAT THE 4 DRAIN VALVES ARE CLOSED
SLOWLY OPEN EACH SUPPLY LINE WHEN YOU HERE IT EQUALIZE OPEN THE VALVE UP 100% THERER ARE 3 SUPPLY LINES
OPEN THE BY PASS VALVE
EACH SUPPLY LINE HAS A TRIAC ACTUATOR, AFTER MANUAL SUPPLY VALVES ARE OPENED GET WITH PRODUCTION SUPERVISOR AND MAKE SURE EACH ACTUATOR FUNCTIONS
WALK AROUND EACH SILO OUT SIDE AND INSPECT THE COOLING JACKETS FOR LEAKS ONCE COOLING VALVES ARE OPEN
Source: Norfolk, NE (Community Member)